Laars Pennant PNCV (Sizes 500-2000) - Install and Operat User Manual

Browse online or download User Manual for Water boiler Laars Pennant PNCV (Sizes 500-2000) - Install and Operat. LAARS Pennant PNCV (Sizes 500-2000) - Install and Operating Manual User Manual [en] [de] [fr]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Installation and Operation Instructions Document 1176H
H2214400H
Installation and Operation
Instructions for
PENNANT
Hydronic Boiler
Model PNCH
Water Heater
Model PNCV
Sizes 500-2000
U.S. Reg. 2,765,423
WARNING
If the information in this manual is not
followed exactly, a re or explosion may
result causing property damage, personal
injury or loss of life.
Do not store or use gasoline or other
ammable vapors and liquids in the vicinity
of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch; do not
use any phone in your building.
Immediately call your gas supplier from a
nearby phone. Follow the gas supplier's
instructions.
If you cannot reach your gas supplier, call
the re department.
Installation and service must be performed
by a qualied installer, service agency, or gas
supplier.
AVERTISSEMENT
Assurez-vous de bien suivres les instructions
données dans cette notice pour réduire au
minimum le risque d’incendie ou d’explosion
ou pour éviter tout dommage matériel, toute
blessure ou la mort.
Ne pas entreposer ni utiliser d’essence ni
d’autres vapeurs ou liquides inammables dans
le voisinage de cet appareil ou de tout autre
appareil.
QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ:
Ne pas tenter d’allumer d’appareils.
Ne touchez à aucun interrupteur. Ne pas vous
servir des téléphones dansle bâtiment où vous
vous trouvez.
Appelez immédiatement votre fournisseur de
gaz depuis un voisin. Suivez les instructions du
fournisseur.
Si vous ne pouvez rejoindre le fournisseur de
gaz, appelez le sservice des incendies.
L’installation et l’entretien doivent être assurés par
un installateur ou un service d’entretien qualié ou
par le fournisseur de gaz.
FOR YOUR SAFETY: This product must be installed and serviced by a professional service technician,
qualied in hot water boiler installation and maintenance. Improper installation and/or operation could
create carbon monoxide gas in ue gases which could cause serious injury, property damage, or death.
Improper installation and/or operation will void the warranty. For indoor installations, as an additional
measure of safety, Laars strongly recommends installation of suitable Carbon Monoxide detectors in the
vicinity of this appliance and in any adjacent occupied spaces.
Page view 0
1 2 3 4 5 6 ... 63 64

Summary of Contents

Page 1 - AVERTISSEMENT

Installation and Operation Instructions Document 1176HH2214400HInstallation and OperationInstructions forPENNANT™ Hydronic BoilerModel PNCHWater Heat

Page 2 - TABLE OF CONTENTS

LAARS Heating SystemsPage 10 U.S. Installations (see note 1) Canadian Installations (see note 2)A = Clearance above grade, veranda, porch, 12

Page 3

Pennant (500-2000)Page 11is required in determining how a blocked vent safety system should be connected to a LAARS product, please call Applications

Page 4 - General Information

LAARS Heating SystemsPage 12When the unit is vented through the roof, the vent must extend at least 3 feet (0.9m) above the point at which it penetr

Page 5 - 1.5 Locating the Appliance

Pennant (500-2000)Page 13DISTANCE FROM GAS METEROR LAST STAGE REGULATORSIZE ANDGAS TYPE 0-100' 0-31m 100-200' 31-61m 200-300' 61-91m

Page 6

LAARS Heating SystemsPage 14 20°F 25°F 30°F 35°F SIZE ow H/L ow H/L ow H/L ow H/L gpm feet gpm feet gpm feet gpm feet 500 43

Page 7

Pennant (500-2000)Page 15PRIMARY/SECONDARY MANDITORY FOR ALLVARIABLE FLOW SYSTEMSINSTALL AIR VENTS AT HIGH POINTS IN SYSTEMPIPING&SIZING OF EXPANS

Page 8 - Venting and Combustion Air

LAARS Heating SystemsPage 16PRIMARY/SECONDARY MANDITORY FOR ALLVARIABLE FLOW SYSTEMSINSTALL AIR VENTS AT HIGH POINTS IN SYSTEMPIPING & SIZING OF

Page 9 - 2.2 Venting

Pennant (500-2000)Page 17Figure 6. Hydronic Piping — One Boiler, Multi-Temperature System.PRIMARY/SECONDARY MANDITORY FOR ALLVARIABLE FLOW SYSTEMSINST

Page 10 - LAARS Heating Systems

LAARS Heating SystemsPage 18LEGENDCHECK VALVETHERMOMETERTEMPERATURESENSORGLOBE VALVEEXPANSION TANKWITH AIR SCOOP ANDAUTO AIR VENT3-WAY VALVEVALVECAU

Page 11 - Terminals

Pennant (500-2000)Page 19LEGENDCHECK VALVETHERMOMETERTEMPERATURESENSORGLOBE VALVEEXPANSION TANKWITH AIR SCOOP ANDAUTO AIR VENT3-WAY VALVEVALVEPRESSURE

Page 12

LAARS Heating SystemsPage 2SECTION 1. General Information1.1 Introduction ... 41.2 Model Identi

Page 13 - Gas Supply and Piping

LAARS Heating SystemsPage 20SECTION 4B.Water Connections — Pennant Water Heater4B.1 Water System Piping — Water HeaterHot water piping should be s

Page 14 - Water Connections —

Pennant (500-2000)Page 21Figure 9. Water Heater Piping — One Heater, One Tank.NOTES:6. CAUTION: PUMP SIZING MUST BE BASED UPON WATER HARDNESS ATJOB SI

Page 15

LAARS Heating SystemsPage 22Figure 10. Water Heater Piping — Multiple Heaters, One Tank.Figure 11. Water Heater Piping — One Heater, Multiple Tanks.

Page 16

Pennant (500-2000)Page 23 GPM FT TEMP RISE °F LPM M TEMPRISE°C SIZE S N H S N H S N H S N H S N H S N H 500 45 68 90 1.8 2.3

Page 17

LAARS Heating SystemsPage 24 SINGLE CIRCUIT CONNECTIONS PUMP HEATER ONLY W/O PUMP WITH PUMP TACO B&G 500 15 20 15 15 750 15

Page 18

Pennant (500-2000)Page 25Figure 14. Field Wiring Panel Figure 15. External Control Connection Wiring.per the suggested piping diagrams, and connected

Page 19

LAARS Heating SystemsPage 265.3 External Staging Control Wiring WARNINGImproper eld wiring may result in re or explosion which can cause property

Page 20 - Pennant Water Heater

Pennant (500-2000)Page 27Figure 16. Pennant 500 - 750 Ladder Diagram.

Page 21 - 1 THROUGH 7.5

LAARS Heating SystemsPage 28Figure 17. Pennant 1000 Ladder Diagram.

Page 22

Pennant (500-2000)Page 29Figure 18. Pennant 1250 - 2000 Ladder Diagram.

Page 23

Pennant (500-2000)Page 3SECTION 6. Operating Instructions6.1 Sequence of Operation ... 366.2 Filling the Boiler Syste

Page 24 - Electrical Connections

LAARS Heating SystemsPage 30Figure 19. Pennant 500 - 1000 Wiring Schematic.

Page 25

Pennant (500-2000)Page 31Figure 20. Pennant 1250 - 1500 Wiring Schematic.

Page 26

LAARS Heating SystemsPage 32Figure 21. Pennant 1750 - 2000 Wiring Schematic.

Page 27

Pennant (500-2000)Page 33Figure 22. Field Wiring.Note: Positions of eld wiring terminals may vary, but terminal designations are as indicated.

Page 28

LAARS Heating SystemsPage 34Figure 23. Field Wiring for Modes 1 - 5.Note: Positions of eld wiring terminals may vary, but terminal designations are

Page 29

Pennant (500-2000)Page 35Figure 24. Field Wiring for Mode 6.

Page 30

LAARS Heating SystemsPage 36SECTION 6.Operating Instructions6.1 Sequence of OperationA call for heat can be initiated either automatically (auto mo

Page 31

Pennant (500-2000)Page 37piping, as described in Step 4.12. Close make-up water valve and check strainer in pressure reducing valve for sediment or d

Page 32

LAARS Heating SystemsPage 38 APPLICATION MODE SYSTEM SETTING SENSORS USED • Parallel piping (non- primary/secondary) hydronic system 1 •

Page 33

Pennant (500-2000)Page 39Figure 27. Temperature Control Target Temperature Graph.These terminals can power a contactor for a larger system pump. L

Page 34

LAARS Heating SystemsPage 4SECTION 1.General InformationUSING THIS MANUAL – Because the Pennant Boilers and Pennant Water Heaters are identical appl

Page 35

LAARS Heating SystemsPage 40Hydronic Primary/Secondary (Mode 2) Programming. Mode 2 is used in primary-secondary piping hydronic systems without out

Page 36 - Operating Instructions

Pennant (500-2000)Page 41 CautionIf the tank temperature control is set too high, a potential for hot water scalding may exist.Mode 2: Primary second

Page 37

LAARS Heating SystemsPage 42Figure 28. Temperature Control Interstage Differential.6.4 Advanced Topics For most installations, Section 6.3 provid

Page 38

Pennant (500-2000)Page 43Figure 29. Temperature Control Min & Max.stage. After the minimum time delay between stages has expired, the control exam

Page 39

LAARS Heating SystemsPage 44Figure 30. Temperature Control Outdoor Start Graph.selected, pump operation is continuous. Also, during outdoor reset, w

Page 40

Pennant (500-2000)Page 45Figure 31. Typical Gas Train Conguration.Figure 32. Typical Control Panel.DSGN temperature is the water temperature required

Page 41

LAARS Heating SystemsPage 466.4.10 External Boiler OperationWhen mode 6 is selected, the control allows for an external control to operate the Penna

Page 42 - 6.4 Advanced Topics

Pennant (500-2000)Page 47 (c) Open gas shutoff valve. Restart the appliance. The ignition sequence will start again and the burner will start. The a

Page 43

LAARS Heating SystemsPage 48SECTION 7.Maintenance7.1 System Maintenance1. Lubricate the system water-circulating pump, if required, per the instru

Page 44

Pennant (500-2000)Page 49and boilers ordered with low temperature controls. To replace the switch, shut off the 120-volt power to the appliance. Remov

Page 45

Pennant (500-2000)Page 51.2 Model IdenticationConsult the rating plate on the unit. The following information describes the model number structure.M

Page 46

LAARS Heating SystemsPage 506. Allow the heat exchanger to drain. Remove the front cover(s) by removing the rubber access strip(s) and the retainin

Page 47 - 6.7 To Restart the Pennant

Pennant (500-2000)Page 51controller setup. Contact your Laars representative to discuss possible remedies.8.4 Short Cycling — Water HeaterShort cycli

Page 48 - Maintenance

LAARS Heating SystemsPage 52models (500 and 750), one 3-stage model (1000), and four 4-stage models (1250 to 2000). The 2-stage models have one igni

Page 49

Pennant (500-2000)Page 53Table 12. Troubleshooting Error Codes.

Page 50

LAARS Heating SystemsPage 54Item Description Size Size Size Size Size Size Size 500 750 1000 1250 1500 1750 2000 Sheet Metal Components

Page 51 - Trouble Shooting

Pennant (500-2000)Page 55 Internal Components See Figures 35 and 3417 Base Assembly 5C1020 7C1020 10C1020 12C1020 15C1020 17C1020 20C102018 Cham

Page 52

LAARS Heating SystemsPage 56 (1) (1) (2) (2)36 Tile, Rear T2015700 (1)37 Tile, Rear, Left Side T2017500 T2016600 T2016600 T20166

Page 53

Pennant (500-2000)Page 57Item Description Size Size Size Size Size Size Size 500 750 1000 1250 1500 1750 2000 Relief Valve, PNCV, 125 PSI

Page 54 - Replacement Parts

LAARS Heating SystemsPage 5871 High Limit, Manual Reset, PNCH RE0015900 RE0015900 RE0015900 RE0015900 RE0015900 RE0015900 RE0015900 High Limit, M

Page 55

Pennant (500-2000)Page 59 Burner Manifold Assy, 4 Burners, Left, LP 10C6520 10C6500 10C6520 10C6520 (2) (2) (2) (4)78 Valve, Ga

Page 56

LAARS Heating SystemsPage 6Figure 1. Dimensional Data.SHIPPING WEIGHTSIZE lbs. kg500 425 193750 505 2291000 615 2791250 675 3061500 760 3451750

Page 57

LAARS Heating SystemsPage 60Figure 33. Sheet Metal Components.

Page 58

Pennant (500-2000)Page 61Figure 34. Internal Components.SeeElectrical Componentsfor detail.

Page 59

LAARS Heating SystemsPage 62Figure 35. Heat Exchanger Components.See pump chart below for pump numbers.Pennant Hydronic Boiler SIZE TACO PUMP P/N

Page 60

Pennant (500-2000)Page 63Figure 36. Electrical Components.

Page 61

H2214400HCustomer Service and Product Support: 800.900.9276 • Fax 800.559.1583Headquarters: 20 Industrial Way, Rochester, NH 03867 • 603.335.6300 •

Page 62

Pennant (500-2000)Page 71.6 Locating Pump-Mounted Water Heater with Respect to Storage Tank(s)For best results, a pump-mounted Pennant water heater s

Page 63

LAARS Heating SystemsPage 8Figure 2. Combustion Air and Vent Through Roof. EACH OPENING* SIZE SQUARE INCHES SQUARE CM 500 125 807 750 188 1

Page 64 - H2214400H

Pennant (500-2000)Page 9length allowed is 50 feet (15.2m). Three elbows have been calculated into the 50-foot (15.2m) linear run. Subtract 10 allowabl

Comments to this Manuals

No comments